I'm having my kitchen ceiling replaced so have taken down the plasterboard. All the cables above are now hanging down and will be in the way of the plasterer when he puts up the new ceiling. Should I clip them to the joists to keep them out of his way or use some other method so they can still be pulled through between lifted floorboards if ever needed?