Hi, i was wondering if i can some advice please, call a guy in to do this job, but has not come back, so desperate to get it finished, myself if i have to, can you please take a look at the pictures that i have taken, and tell me what i have to do, they guy said that the hole he dug, is the existing toilet soil pipe, he said that he was going to connect the new toilet to the same toilet pipe, with a Y branch fitting, i spoke to our local council which said that this was ok and we didn't need any permission of of them to do this, can somebody please explain what i have to do, i am DIY competent, but haven't done this type of work before, any help would be fantastic thanks'