Hello,
I am planning a side return project. The floor plan will be somewhat along the lines of the image. My question is not regrading the actual side return, but regarding the removal of an internal hallway wall. The dotted line is currently an internal stud wall and I want to remove it to open the space up of the second reception room. I am aware that a structural engineer needs to check this for load bearing etc, but I am coming more from a fire reg side. I am aware of some properties in my area who have successfully removed this wall, but my architect tells me that regs have changed and this would not be allowable anymore due to fire escape route. The only way to make this work would be with a sprinkler system, which would be a massive overkill.
Does anyone know which fire regs are considered here and if there is no way to make this work with an appropriate number smoke alarms?

I am planning a side return project. The floor plan will be somewhat along the lines of the image. My question is not regrading the actual side return, but regarding the removal of an internal hallway wall. The dotted line is currently an internal stud wall and I want to remove it to open the space up of the second reception room. I am aware that a structural engineer needs to check this for load bearing etc, but I am coming more from a fire reg side. I am aware of some properties in my area who have successfully removed this wall, but my architect tells me that regs have changed and this would not be allowable anymore due to fire escape route. The only way to make this work would be with a sprinkler system, which would be a massive overkill.
Does anyone know which fire regs are considered here and if there is no way to make this work with an appropriate number smoke alarms?