Im pricing up a job to install power to a portakabin (2 way board) approx 25 metre from DB, using 10mm swa running through factory at around 3 metre height to a point outside, the board is old mem, someone said that i should not be coming from DB (3phase 24 way) and should be coming from mains board, who is right ? it will only be used for general office work.