Search results

  1. M

    ACO channel installation help

    Yes I was thinking the same You don’t think the concrete edge would look silly next to the path edge?
  2. M

    ACO channel installation help

    I am installing an aco alongside this path edge (red string line will be top of aco drain) It’s an old 1902 property and the path is all over the shop so across the width of the patio some parts of the patio will be level with the path and some will be lower (i am installing level L to R and...
  3. M

    Running waste pipe underground for sink in log cabin

    Thank you for your help much appreciated
  4. M

    Running waste pipe underground for sink in log cabin

    I work in my log cabin (sports massage) and while I’ve dug down for my patio and drainage, now would be the time to install a sink and run the water pipes from the house and Install a sink in log cabin. Just a couple of questions: 1. The sink waste would come out of the log cabin… do I run a...
  5. M

    Laying Indian stone with stringlines

    Just planning ahead before laying my Indian stone (4 different size slabs) I understand how to use string line with the same sized paving slabs, but how do I go about laying the slabs of different sizes using string lines? I am installing concrete edging around the perimeter of the patio area...
  6. M

    Do I need to stop it out and start again?!

    I’ve bought a 3m length of timber and cut it down to 2.7m (length of patio where fall is), and put a long spirit level in the middle. I’ve used it to set up a string line and the total fall is just over 20mm across the 2.7m length. I calculate this as a 1:120 fall. Any more than this I feel...
  7. M

    Do I need to stop it out and start again?!

    It’s a textured Indian stone I’m laying. There is an aco channel going next to the path edge thet runs behind my terraced house (so not directly next to house) It’s probably not far off level based on the first edge… maybe I should take it out considering I’m at this stage…. Would you?
  8. M

    Do I need to stop it out and start again?!

    So 2700/80 = 33.75 = 3.4cm drop Is that overkill and will it show up too much? So basically I should rip it out and start again? Doh
  9. M

    Do I need to stop it out and start again?!

    I laid my first concrete edging piece and I don’t think I have the the fall correct from the word go. I’m Laying an Indian stone patio It’s a 2.7m x 4m patio but the fall is going to be on the 2.7m from front to back I’ve installed my first flat top edge (there is a gap under spirit level as...
  10. M

    Laying Indian stone next to an edge

    When laying an Indian stone patio, do I leave a gap between the paving and the concrete flat top edging and ACO drain or do I butt the paving up to both the edge and aco? Cheers
  11. M

    Crusher run instead of MOT Type 1

    I’ll stick with MOT type 1… considering the whole job is costing me 1k I’d rather pay £40 more knowing that the base once done is done for good
  12. M

    Crusher run instead of MOT Type 1

    I’m in Leeds So crusher run is effectively MOT and ok to use on my patio sub base?
  13. M

    Crusher run instead of MOT Type 1

    My local building merchants use crusher run instead of Type 1 MOT Is crusher run suitable for long term longevity for patio sub base or should I use MOT? Cheere
  14. M

    What to fill this big hole with?

    Great thanks On top of the pea gravel would i just fill with lots of MOT type 1 hardcore and bring to level required for patio sub base? Cheers
  15. M

    What to fill this big hole with?

    I am connecting an aco drain into the pipe work that can be seen in the pic below. Can I just check that what I plan on doing is correct? Fill the void with pea gravel and sit pipework on that. Connect up to aco and once connected, fill the remainder of the hole with MOT Type 1. I am...
  16. M

    How much water to concrete mix

    I’m laying flat top concrete edging with a drier mix for the bedding and a wet mix for the haunching I am using 6 spades ballast to 1 spade cement mix For bedding the concrete edging in, how much water do I need to add to that mix? I think my first mix was too dry (I barely added water) and...
  17. M

    Connecting aco drain to old clay pipe

    I am installing an aco drain to an old clay pipe It’s quite an awkward angle, is there a flexible 110mm pipe that I can use for such a job to connect the aco to this clay pipe (I’m putting a rubber adaptor on to allow me to connect 110mm pipe to it) Cheers
  18. M

    Help laying concrete edging and aco drainage

    Cheers I have 9m total length for edging and a 4m length of aco drain to install against a current path edge Any idea how much ballast I will need? Will small bags suffice or will I need a tonne bag?
  19. M

    Help laying concrete edging and aco drainage

    Thanks for your reply So a decent chunky mix for bedding in the aco drain As for the concrete edging (patio only, no car use) is it worth making a concrete mix using pea gravel or is a mortar mix okay to bed the edging stones in? Cheers
  20. M

    Help laying concrete edging and aco drainage

    I am installing a new patio and I’ve dug down 17cm (22mm slab, 50mm mortar bed, 100mm hardcore compacted) I am installing some flat topped concrete edging (900mm x 150mm x 50mm) over a total length of 9 metres Along he front edge of patio I am installing an aco drain Do I need to lay some...
Back
Top