I have dug and levelled MOT type 1 ready for concrete.
1.2 cubic metres are needed. I stupidly assumed I could get a concrete lorry to turn up, run a hose approx 25m away into the shuttering and pour.
My now deceased father did this 15 years ago, quite easily - yellow pages, they turned up a...