I need some more advice please, Before the conservatory people screed my new floor they said i can run my radiator pipework (10mm) on the base before they do the final top screed.
Do i have to buy any special copper pipe ? if not can the 10mm be laid direct under the screed, OR does it have to be sleeved, If so in what.? conduit, hose etc.
Also i will be exiting into the conservatory about half way of the 7 1/2 m,
can i run straight to the radiators from here or do i need to run the pipes around the outside of the new floor.
Many thanks, you helped last time, so i have a lot of faith in ya.......
spookyspaniel.
I need some more advice please, Before the conservatory people screed my new floor they said i can run my radiator pipework (10mm) on the base before they do the final top screed.
Do i have to buy any special copper pipe ? if not can the 10mm be laid direct under the screed, OR does it have to be sleeved, If so in what.? conduit, hose etc.
Also i will be exiting into the conservatory about half way of the 7 1/2 m,
can i run straight to the radiators from here or do i need to run the pipes around the outside of the new floor.
Many thanks, you helped last time, so i have a lot of faith in ya.......
spookyspaniel.