I am renovating a house at the moment and i have a combi heating system with 6 rads and a towel rail on the loop. It is a small 3 bed semi.
The heating is all in 15mm and because i have rejigged some walls and moved some rads about the pipework going into the boiler is all exposed and has been cut at the moment.
So do i just reinstate everything back to 15mm or should i put the flow and return into 22mm ? It would mean taking the pipework up stairs in 22mm until the hall way, where it will branch off to 15mm and the same on the ground floor.
OR is everything ok as it is in 15mm ?