Hi,
Are there any particular gaps/separation distances required where a gas pipe crosses horiziontally behind a soil stack on an external wall ... when an exploratory sample of 22mm pipe is on Talon clips it just touches the soil stack.
Gas hob installation: is sealant 'putty' around the perimeter of the hob a regulation requirement, or could something else be used (that would also allow removal when required).
Anyone know what the stuff is, feels like a cross between bluetac and glazing putty.
I see a form of foam tape is offered, but dont see that lasting long.
Thanks.
Are there any particular gaps/separation distances required where a gas pipe crosses horiziontally behind a soil stack on an external wall ... when an exploratory sample of 22mm pipe is on Talon clips it just touches the soil stack.
Gas hob installation: is sealant 'putty' around the perimeter of the hob a regulation requirement, or could something else be used (that would also allow removal when required).
Anyone know what the stuff is, feels like a cross between bluetac and glazing putty.
I see a form of foam tape is offered, but dont see that lasting long.
Thanks.