Hi!
We've just had the 1st quote back from an architect and are slightly
shocked at the price! Just wondered if anyone else could give their opinions please? We will be getting a 2nd opinion but in the meantime I'm not sure what to think of this ....
4 bed house
creating new dormer the length of the rear of the property (approx 12m long)
changing the layout of the upstairs - knocking airing cupboard through to make a double bedroom, moving internal walls slightly to make rooms square, bricking up 1 window, knocking through toilet / bathroom into one, creating an en-suite and the new dormer will give additional floor space and make all the rooms bigger.
All of this work can be done within permitted development and we will get a lawful development certificate so we won't be needing planning permission.
The quote we received:-
£1900 for planning drawings
£875 for building regs drawings
£500 structural engineers fees
£75 for lawful development certificate
£135 for building regs costs
Total = approx £3500
Also to add we know what we want the new layout upstairs to be so we aren't particularly looking for ideas from the architect.
If we are getting a lawful development certificate - do we need the planning drawings? Are the building regs drawings sufficient?
Thanks in advance for any advice
We've just had the 1st quote back from an architect and are slightly
4 bed house
creating new dormer the length of the rear of the property (approx 12m long)
changing the layout of the upstairs - knocking airing cupboard through to make a double bedroom, moving internal walls slightly to make rooms square, bricking up 1 window, knocking through toilet / bathroom into one, creating an en-suite and the new dormer will give additional floor space and make all the rooms bigger.
All of this work can be done within permitted development and we will get a lawful development certificate so we won't be needing planning permission.
The quote we received:-
£1900 for planning drawings
£875 for building regs drawings
£500 structural engineers fees
£75 for lawful development certificate
£135 for building regs costs
Total = approx £3500
Also to add we know what we want the new layout upstairs to be so we aren't particularly looking for ideas from the architect.
If we are getting a lawful development certificate - do we need the planning drawings? Are the building regs drawings sufficient?
Thanks in advance for any advice