I have a problem getting two 22mm T's into a heating system flow and return pipework to install a towel radiator.
- The flow and return 22mm copper pipes are soldered and set in a concrete kitchen floor!
The pipes travel behind the kitchen units without access anywhere apart from where you see. Pipes have no movement.
My solution was drain down, de-solder elbows, cut and shut new fittings (two 22mm T's) and resolder whole job with feeds for rads.
labourious job!
Does anybody have a simple solution??