Hi!
Looking for some advice.
We are planning our bathroom, partitioning off a stud wall in our bedroom for an Ensuite.
Ideally we would like a semi ped on one of the new walls.
hot and cold csn come under the floorboards and up the stud wall with no problem, but can someone let me know if it is possible to do the same with the waste - eg run it down vertically through the stud wall between the stud uprights, then across under the floorboards and out into the external soil stack?
Hope it's possible as not keen on a full pedestal.
Cheers!
Looking for some advice.
We are planning our bathroom, partitioning off a stud wall in our bedroom for an Ensuite.
Ideally we would like a semi ped on one of the new walls.
hot and cold csn come under the floorboards and up the stud wall with no problem, but can someone let me know if it is possible to do the same with the waste - eg run it down vertically through the stud wall between the stud uprights, then across under the floorboards and out into the external soil stack?
Hope it's possible as not keen on a full pedestal.
Cheers!