Hi
Now I may be being a bit daft here...
I was going to have two external solid walls chased inside for cable runs. Instead of me renting chaser tool ect I asked electrician and he said to, 'fit all the battons first and he can chase around them.'
It is c21 metres he needs to chase overall. Beats me how that is possible if every 40cm is a vertical batton and your going horizontal.
I did point this out but he said could chase around the battons, and he asked me to batton first before he did first Fix?
That just seems wrong order to me, harder, more risk damaging battons, perhaps taking me down route of cables clipped rather than chased which I do not want.
If this is normal do say, not a clue bar watching videos that all show blank wall before chasing
.
Now I may be being a bit daft here...
I was going to have two external solid walls chased inside for cable runs. Instead of me renting chaser tool ect I asked electrician and he said to, 'fit all the battons first and he can chase around them.'
It is c21 metres he needs to chase overall. Beats me how that is possible if every 40cm is a vertical batton and your going horizontal.
I did point this out but he said could chase around the battons, and he asked me to batton first before he did first Fix?
That just seems wrong order to me, harder, more risk damaging battons, perhaps taking me down route of cables clipped rather than chased which I do not want.
If this is normal do say, not a clue bar watching videos that all show blank wall before chasing
.