hi guys this is my first post on here after a bit of advice on a few things
firstly i need to install a 2g socket and a 2way switch onto a chimney breast, are there any rules and regs regarding this? i was thinking from the heat point of view, its a real wood fire that gets quite hot
secondly i need to add more sockets to mu upstairs ring circuit, currently i have to 1g sockets in the room, ive taken the floor boards up and the sockets in the room dont link to each other so i cant reroute it that way, is the best way to cut into one of the legs of the first socket install a 30a jb, out of the jb to my new sockets then install another jb on one of the legs on my second original socket in the room.
is that the best way to go?
thanks lads
firstly i need to install a 2g socket and a 2way switch onto a chimney breast, are there any rules and regs regarding this? i was thinking from the heat point of view, its a real wood fire that gets quite hot
secondly i need to add more sockets to mu upstairs ring circuit, currently i have to 1g sockets in the room, ive taken the floor boards up and the sockets in the room dont link to each other so i cant reroute it that way, is the best way to cut into one of the legs of the first socket install a 30a jb, out of the jb to my new sockets then install another jb on one of the legs on my second original socket in the room.
is that the best way to go?
thanks lads
