A much discussed topic but even after a lot of reading I still have a question. It seems quite clear that bonding needs to be within 600mm - but there's conflicting info whether it's 600mm of the pipe entering the building or 600mm of the meter.
Pic of both my gas entry point and meter:
As you can see, there's zip all bonding! The pipes are so chunky that regular bonding straps don't even go all the way around. Can I bond to the metal plate on the meter itself - i.e. nut, bolt n washer? Pic of reverse below.
Cheers for any help!
Pic of both my gas entry point and meter:
As you can see, there's zip all bonding! The pipes are so chunky that regular bonding straps don't even go all the way around. Can I bond to the metal plate on the meter itself - i.e. nut, bolt n washer? Pic of reverse below.
Cheers for any help!