Hi
having a conservatory fitted and concrete base will be going down next week, question is I would like to put a rad in it. which is the best option? put some pipes in the floor first or surface mount later. The system is a combi boiler with 10mm poly pipe thanks in advance for replies
having a conservatory fitted and concrete base will be going down next week, question is I would like to put a rad in it. which is the best option? put some pipes in the floor first or surface mount later. The system is a combi boiler with 10mm poly pipe thanks in advance for replies