Hi All,
I've got a Vaillant ecotec plus 831 combi, installed less than 2 years ago. All pipes are new throughout the house as well.
Builders have started today doing some plastering in 4 rooms. I will need to remove at least 4 large rads to do this. This will leave a small rad in loft, box room, a bathroom towel rail and one regular sized rad downstairs.
Would their be any issues (pressure) with me refilling the c/h with just these rads working. The boiler pressure when off is about 1.1bar and rises to about 1.5 when heating is on. This is so that we can have hot water while they are doing the work.
Thanks
Paul
I've got a Vaillant ecotec plus 831 combi, installed less than 2 years ago. All pipes are new throughout the house as well.
Builders have started today doing some plastering in 4 rooms. I will need to remove at least 4 large rads to do this. This will leave a small rad in loft, box room, a bathroom towel rail and one regular sized rad downstairs.
Would their be any issues (pressure) with me refilling the c/h with just these rads working. The boiler pressure when off is about 1.1bar and rises to about 1.5 when heating is on. This is so that we can have hot water while they are doing the work.
Thanks
Paul