Concrete cavity fill (225mm below dpc) question?

Joined
1 Aug 2020
Messages
57
Reaction score
0
Country
United Kingdom
Hi Guys,

I will be filling my cavity as per title over the weekend prior to backfilling and compacting the ground.

I know i need to use 8 part balast to 1 part cement gfor the mix...but i have read conflicting messages about the consistency of the mix....should it be wet or dry?

Also i have bridging at 2 sections (water and electric services)...how do i stop the concrete running out of the opening under the lintel.....(my dpc level is 1500mm to the concrete foundation in some places).

Thanks.
 
Sponsored Links
Wet or dry it don't matter.

Dirt, rag, polystyrene to plug the hole. That don't matter either.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top