In the spare bedroom I am currently decorating there is a door to the loft. I thought while I was doing the room up I would realign the door and frame. In the end I had to take the door off and the framing above beloon the hinge side. I have repacked the hinge side of the door and it now aligns better both sides. I was going to put a piece of 3x2 across the top as the header and then plasterboard all around the door so that I can put up coving and then paper. I need to pack out the plasterboard on the left side above the door as the door doesn't run parallel to the wall ( didn't want to alter the step )
Should I nail up the packing strips and then glue the plasterboard so that I don't need to skim prior to papering?
Any advice greatly appreciated
View media item 92567
View media item 92568
Should I nail up the packing strips and then glue the plasterboard so that I don't need to skim prior to papering?
Any advice greatly appreciated
View media item 92567
View media item 92568