Hello, I have had planning permission for a project, and I am in touch with a private building control for a quote to do drawings etc for Full Plans.
However, I have already booked a digger in a weeks time to dig the footings out - and I am unlikely to have full building control in place with plans by then.
So my question is - can I crack on and dig out the footings, 1m deep, 600mm wide for a dormer bungalow, without implications on building regs?
However, I have already booked a digger in a weeks time to dig the footings out - and I am unlikely to have full building control in place with plans by then.
So my question is - can I crack on and dig out the footings, 1m deep, 600mm wide for a dormer bungalow, without implications on building regs?