- Joined
- 12 Dec 2016
- Messages
- 448
- Reaction score
- 3
- Country
The ground below where i put this wasn't level and I had dig out a fair bit on the left side but I didn't dig it all out level. Consequently, the right side of fence is not touching the ground. I rammed a rock underneath. Is this acceptable?
I did it for friends rental house which is a right dump anyway and won't care but worried it still ok on another job?