Hi all,
On a block wall that is about to be dot and dabbed. There is cables on the block running to where a socket etc will go. whats the proceedure? Do i fit the back boxes first then D&D or do i D&D and then cut out for the boxes?
Thanks
On a block wall that is about to be dot and dabbed. There is cables on the block running to where a socket etc will go. whats the proceedure? Do i fit the back boxes first then D&D or do i D&D and then cut out for the boxes?
Thanks