My next project is to install 15 x Aurora IP65/firerated 240v spots in my bathroom. I live in new build (7yrs old) 1st floor flat hence the need for fire rated lights.
Although im not an electrician (I have no experience in residential electrical work and in fact moved away from the tools 5 yrs ago), but have 16th edition and apprenticeship/HNC in electrical maintenance so i'm competent and safe. I will obviously notify the building council of my intentions in any case.
I have removed the old ceiling light and can feel a suitable gap between the ceiling plasterboard and joists and wondered if i can safely run T&E through it or should the cable be run in conduit? Why would there be a gap as i expected the plasterboard to be fixed directly to the joists.
Is there anything else i should bare in mind?
Thanks
Although im not an electrician (I have no experience in residential electrical work and in fact moved away from the tools 5 yrs ago), but have 16th edition and apprenticeship/HNC in electrical maintenance so i'm competent and safe. I will obviously notify the building council of my intentions in any case.
I have removed the old ceiling light and can feel a suitable gap between the ceiling plasterboard and joists and wondered if i can safely run T&E through it or should the cable be run in conduit? Why would there be a gap as i expected the plasterboard to be fixed directly to the joists.
Is there anything else i should bare in mind?
Thanks