It could depend on the pitch, a need to match an existing eaves or not, the detail and how it’s supported, personal preference, the soffit, vents required or not, all sorts …. The ideal overhang will vary to suit each situation.
Well basically I have not even finished blocking to the required height yet so all options are open. I am going to be using 2x4 for the trusses, the span from wall to wall will be 4m, there will be no vents needed as far as I can see. Single block construction.
If this is going to be a version of the 1970s flat roofed garage, slope from front to back , very shallow pitch, say 1 in 20. Then what happens at the back is that water drips backwards from the edge towards the building. Don't ask, because superficially its running up hill by 1/4" or so, could be with the wind, or dust sticking to the underside of the overhang. So with this form of construction some drip rail is imperative to stop this effect or an overhang of 2' !! I suspect a bead of silicone a few inches in front of the wall would be enough.
Frank
The pitch I was thinking will be either 12/6 or 12/7. Not decided yet. I don't want a really shallow pitch as I'd like to have a little storage in the roof space. I think the plan is to have an overhang of 25cm and then fit some nice wooden shiplap soffits - give it a log cabin feel
I will also follow the same 25cm overhang at the gable ends with a small-ish ladder.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local