I suppose that is a habit that some folk use "Incredible" in the same way they might sometimes use "Fabulous", rather than not true they mean difficult to actually perceive that it is true , "Fabulous" means not true but is often taken to mean "Too Good to be True" or almost such, "Incredible" might be often used to mean too good or too bad to be true.
Just my humble opinion.
A bit like saying someone has done the impossible, if if is impossible it can not be done so we exaggerate the impossible to mean amost impossible or we thought it was impossible until we actually saw it done.
I was misunderstood a few short years back when a a former schoolgirl aquaintance of mine told me she had got married had two teanage girls and her husband decided he was gay and she left him and took the two girls and a suitcase and nothing else and started a new life.
I replied something like "Heck that is quite a tale" and she replied "No it is actually true" , she had taken my use of the word "Tale" as meaning untrue, my intent was not to thing it untrue but yes I believed her story . Some may disagree with me.
I will not mention the incorrect use of the word "Refute" that seems to be popular in polotics these days!
I can appreciate a need to have some random timings to reduce surge effects of loads but not the non-synced times for billing, I would have expected, prior to this thread that both switching tarriff and load to be synced together at the same time and that exact time to have some deliberate offset by a random or psuedo random method or some delberate order instruction to the installing engineer.
We are usually quite happy ourselves to allow some "Cooker" Diversity almost random element to come into our considerations and we are seldom aware of any actual problems in that method.
Just my humble opinion.
A bit like saying someone has done the impossible, if if is impossible it can not be done so we exaggerate the impossible to mean amost impossible or we thought it was impossible until we actually saw it done.
I was misunderstood a few short years back when a a former schoolgirl aquaintance of mine told me she had got married had two teanage girls and her husband decided he was gay and she left him and took the two girls and a suitcase and nothing else and started a new life.
I replied something like "Heck that is quite a tale" and she replied "No it is actually true" , she had taken my use of the word "Tale" as meaning untrue, my intent was not to thing it untrue but yes I believed her story . Some may disagree with me.
I will not mention the incorrect use of the word "Refute" that seems to be popular in polotics these days!
I can appreciate a need to have some random timings to reduce surge effects of loads but not the non-synced times for billing, I would have expected, prior to this thread that both switching tarriff and load to be synced together at the same time and that exact time to have some deliberate offset by a random or psuedo random method or some delberate order instruction to the installing engineer.
We are usually quite happy ourselves to allow some "Cooker" Diversity almost random element to come into our considerations and we are seldom aware of any actual problems in that method.
