We're getting a new ceiling installed and contractor is part way through job.
Earlier today, while taking off some plasterboard on the wall, an electric cable was cut through, tripping the fuse box.
One of the team reconnected the electrics, which have been left as shown in the picture below.
Is this ok; if not why not?

Uploaded with ImageShack.us
Earlier today, while taking off some plasterboard on the wall, an electric cable was cut through, tripping the fuse box.
One of the team reconnected the electrics, which have been left as shown in the picture below.
Is this ok; if not why not?

Uploaded with ImageShack.us