The utility doesIf it doesn't have a window how can it lose light.
The utility doesIf it doesn't have a window how can it lose light.

Pitch would go upto benth the windows.What height are you building up to?
4m roughly to the wallAlso how far out?
Its been bricked updon't you have a similar window that the side of their building blocks?
Yes but theirs isnt 4m....I still think it's petty.they're trying to stop you doing exactly what they've already done.
Me too, but we've changed it now and we are gonna go for a 3m less hassle....can that be objected to?I'd hope that planning will politely say they've weighed everything up and they can stick their stupid objection where the sun doesn't shine.
Thays all it is., if its brickwork, roof, windows, bifolds and plastering as quoted thats fine
Thats my job.but double check whether electrics
That'll be extra.plumbing first fix and screed are in or extra. a lot of extensions get quoted at one price for the shell and then second fix (bathroom, kitchen, flooring, decorating)
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local