Having removed a couple of walls in the utility I now have a 4m x 1m section in which the concrete floor is lower (by design, originally) by about an inch than the rest.
Just wondering the best way to bring it up:
1. concrete (concerned with it cracking)
2. two sheets of 1/2" ply, well screwed down
3. Lots of levelling compound!
The boss wants vinyl down eventually.
Any thoughts please.
Just wondering the best way to bring it up:
1. concrete (concerned with it cracking)
2. two sheets of 1/2" ply, well screwed down
3. Lots of levelling compound!
The boss wants vinyl down eventually.
Any thoughts please.