We have built an extension and run the cables ourselves. We have had the first fix electrics checked (and OKed) by BC appointed electrician.
Now the extension is finished we need to arrange an appointment to have the electrician back for final inspection, testing (and hopefully approval!).
Just double checking but I am under the impression that I am to leave the new circuit disconnected and that they connect when they come to test etc. Is this correct? (or do I connect up first, which would kind of defeat the testing element of their visit?)
TIA