I'm going demented with this build, never again.
Garage floor was not level so builder dug out a section to relay and make level, so that the garage door would sit flush.
That was poured at about 12 pm yesterday afternoon. Steel mesh was inserted also and it's about 150 deep slab.
I have looked through morning and there is a few long cracks. Is this anything to worry about or should I move on? Just a shame when it's brand new and not even close to dry yet. Anything can be done about it?
Pics attached...

Garage floor was not level so builder dug out a section to relay and make level, so that the garage door would sit flush.
That was poured at about 12 pm yesterday afternoon. Steel mesh was inserted also and it's about 150 deep slab.
I have looked through morning and there is a few long cracks. Is this anything to worry about or should I move on? Just a shame when it's brand new and not even close to dry yet. Anything can be done about it?
Pics attached...