S
sturharv
On a job at the moment, which currently has no gas supply although there is an existing gas U16 meter at the boundary supplying another building on the same site. The building is an extension to an existing café, the installers are looking at connecting the gas off the 63mm supply after the meter and running it to the new extension.
Can we split the supply in the ground, one above ground entry to the plant room and one above ground entry to the commercial kitchen room i.e. two entry points into the same building with two separate isolator valves? This will mean to isolate the full building there will be two lever valves to close, can anyone see a problem with this? the kitchen and plant room are quite far apart so running the gas to each area internally would be difficult.
Can we split the supply in the ground, one above ground entry to the plant room and one above ground entry to the commercial kitchen room i.e. two entry points into the same building with two separate isolator valves? This will mean to isolate the full building there will be two lever valves to close, can anyone see a problem with this? the kitchen and plant room are quite far apart so running the gas to each area internally would be difficult.