Went to a PIR oops sorry a EIC few days back in a commercial kitchen,
now I know a few of you will be aware of the requirement for gas safety valves, well this was carried out not to long ago, and the gas safety engineer re-routed the gas supply pipe right across a socket outlet he also had the presence of mind to jack the pipe out far enough to clear the two plugs that were in the socket at the time, as a result plugs cannot be withdrawn for testing the socket, and to help matters one plug is in dire need of replacement.
DM
now I know a few of you will be aware of the requirement for gas safety valves, well this was carried out not to long ago, and the gas safety engineer re-routed the gas supply pipe right across a socket outlet he also had the presence of mind to jack the pipe out far enough to clear the two plugs that were in the socket at the time, as a result plugs cannot be withdrawn for testing the socket, and to help matters one plug is in dire need of replacement.