Hi,
We have recently levelled our rear garden in preparation for a new extension but have found the existing yellow 25mm gas pipe cuts
across the new foundations.(As yet un-dug)
I would like to have an extension piece of around 6 metres put in so
I can alter the course of the pipe run so its not in anyones way.
All trenches are dug, all yellow plastic hollow pipes are laid (75mm)
in position.
All that needs doing is the existing pipe to be cut and the extention piece
connecting up.Max 1 or 2 hrs work imho.
Phoned Nation Grid and was quoted £450 and 6 weeks wait.
Have they got a monopoly on this or can someone else do the work?
Thanks in anticipation!!
We have recently levelled our rear garden in preparation for a new extension but have found the existing yellow 25mm gas pipe cuts
across the new foundations.(As yet un-dug)
I would like to have an extension piece of around 6 metres put in so
I can alter the course of the pipe run so its not in anyones way.
All trenches are dug, all yellow plastic hollow pipes are laid (75mm)
in position.
All that needs doing is the existing pipe to be cut and the extention piece
connecting up.Max 1 or 2 hrs work imho.
Phoned Nation Grid and was quoted £450 and 6 weeks wait.
Have they got a monopoly on this or can someone else do the work?
Thanks in anticipation!!