Guys I need some help please,
Recently had the hallway boarded and plastered. Before that I had new door linings put in and the guy doing it did such a bad job (I was away with work) managed to get my money back but the plastering had already gone ahead.
Now it's time to install the architrave and get the doors sorted but I'm at such a loss now I'm going to attempt it myself as dealing with trades just isn't worth it they all seem to make a mess for us.
The board doesn't sit flush with the door casing (knew it wouldn't as being dot and dabbed) but it's not even at the top nor bottom.
I will have to fit a filler piece of timber but just after advice on how to get it equal
I will post some photos shortly once i get my head around uploading them.
Recently had the hallway boarded and plastered. Before that I had new door linings put in and the guy doing it did such a bad job (I was away with work) managed to get my money back but the plastering had already gone ahead.
Now it's time to install the architrave and get the doors sorted but I'm at such a loss now I'm going to attempt it myself as dealing with trades just isn't worth it they all seem to make a mess for us.
The board doesn't sit flush with the door casing (knew it wouldn't as being dot and dabbed) but it's not even at the top nor bottom.
I will have to fit a filler piece of timber but just after advice on how to get it equal
I will post some photos shortly once i get my head around uploading them.
Last edited: