This follows a post I made a few months ago when I was at the planning stage...
I've now got my trenches dug out and all my parts are coming tomorrow. Plan is to pour in my pea shingle level and achieve the gradient I need (1:40) by packing under the drainpipe with packers to achieve the desired angle. Planning to do this because I think it'll be more accurate than trying to get the right gradient with the pea shingle.
Is this ok? Or can you think of a better method?
Also, is it alright to use fairy liquid in place of the expensive pipe lubricant?
Thanks in advance!
I've now got my trenches dug out and all my parts are coming tomorrow. Plan is to pour in my pea shingle level and achieve the gradient I need (1:40) by packing under the drainpipe with packers to achieve the desired angle. Planning to do this because I think it'll be more accurate than trying to get the right gradient with the pea shingle.
Is this ok? Or can you think of a better method?
Also, is it alright to use fairy liquid in place of the expensive pipe lubricant?
Thanks in advance!