Had a Bricklayer start on Tuesday with a laborer. £250 a day for both. 40m2 extension, beam and block floor already layed. Need them to lay 500 brick plus 42 blocks up to damp then 600 blocks above damp. So far after 2 days they have layed 42 blocks and 344 bricks. Yes they speny 20 mins helping me move some steel beams and the laborer has spent some time today backfilling some trenches (not asked for). However I would of expected them to be at least up to damp by now. Am I being unreasonable? I want to say somthing. Pics attached for a better idea of job.