Hi Folks
Sorry if you have answered this one before I have spent some time searching but cannot find any specific clear info I understand.
A friend of my wife had a new boiler installed about two months ago and has not received any docs from the builder who claimed to be Corgi reg.
He relocated the new boiler from the kitchen to the upstairs bathroom and added one new radiator to the system. He has disconnected the room stat and has not fitted any TRV's to any rads including the new one.
It is my understanding form the little knowledge I have that he should have fitted TRV's to all rads with excluding the rad where the room stat is fitted (if is was connected that is).
He has cross bonded the pipework however he has not provided an docs such as Benchmarking etc. What docs should he have provided as a absolute minimum and what is recommended. Should he inform building control and Corgi or is that just good practice?
In a nutshell what should he have provided as an absolute mininum and what documentation should have been completed?
Thanks in advance
Sorry if you have answered this one before I have spent some time searching but cannot find any specific clear info I understand.
A friend of my wife had a new boiler installed about two months ago and has not received any docs from the builder who claimed to be Corgi reg.
He relocated the new boiler from the kitchen to the upstairs bathroom and added one new radiator to the system. He has disconnected the room stat and has not fitted any TRV's to any rads including the new one.
It is my understanding form the little knowledge I have that he should have fitted TRV's to all rads with excluding the rad where the room stat is fitted (if is was connected that is).
He has cross bonded the pipework however he has not provided an docs such as Benchmarking etc. What docs should he have provided as a absolute minimum and what is recommended. Should he inform building control and Corgi or is that just good practice?
In a nutshell what should he have provided as an absolute mininum and what documentation should have been completed?
Thanks in advance