The Main DB for the house, which is in the kitchen, I have now gotten around to replacing.
The meter was moved by the DNO, and all the new DBs have been all been tested and signed off.
Here are some pictures of the old burnt line tail which went from the service head to the meter (It was burnt due to a loose connection in the service head)
Here are some pictures of the new main DB in the kitchen
Before
During
new Main DB with cover removed
After
The FCUs & timer are for the courtyard lights and water feature