Hi all,
Just a quick one we're in the process of building a mezzanine floor with a staircase and we're going down the official route with building control etc, I am just wondering now that I've done it will building control be happy with the top newel post of the stairs connected to the joist like this:
Its simply sitting flush to the joist with 5x 6mm screws
I'm aware that the usual method would be to notch it into a joist, but the joist was just a bit too far back in this case. Its also properly jointed to the outside stringer with a mortise and tenon joint. Thoughts please?
Cheers
Just a quick one we're in the process of building a mezzanine floor with a staircase and we're going down the official route with building control etc, I am just wondering now that I've done it will building control be happy with the top newel post of the stairs connected to the joist like this:
Its simply sitting flush to the joist with 5x 6mm screws
I'm aware that the usual method would be to notch it into a joist, but the joist was just a bit too far back in this case. Its also properly jointed to the outside stringer with a mortise and tenon joint. Thoughts please?
Cheers


