C
cumbriahandyman
Started a job today which was to swap out a bathroom site. A good day, day and a half work. I thought...
Took bath out last and the floor was rotten, took up floor and joist ends are rotten.
Customer quite happy to pay for all necessary work. The only thing I have a problem with is the toilet waste. I accidentally knocked the waste pipe and it came out of the collar fixing it to the solid pipe and I just know that it is not going to go back in and be water tight.
The plastic pipe was only into the solid pipe by about an inch, see pictures.
Can I get a longer collar to connect the two and from the pictures can you tell what size the pipe and collar is?
Cheers...
You can see how little of the pipe was inserted.
Took bath out last and the floor was rotten, took up floor and joist ends are rotten.
Customer quite happy to pay for all necessary work. The only thing I have a problem with is the toilet waste. I accidentally knocked the waste pipe and it came out of the collar fixing it to the solid pipe and I just know that it is not going to go back in and be water tight.
The plastic pipe was only into the solid pipe by about an inch, see pictures.
Can I get a longer collar to connect the two and from the pictures can you tell what size the pipe and collar is?
Cheers...
You can see how little of the pipe was inserted.