Hey chaps
I went to a 100He (bahama megaflow or what ever they decide to badge it as today ) and the lock out light was lit
So i try to reset it Nowt
I check the OV thermister room temp 15k Which I presume is ok
Temp Thermister the same
I disconnect the earth on the condesate trap and nowt
So I change the Main PCB (after driving like a mad thing to the shop before the lazy wotsits take the rest of the day off!! gits) and Success I thought
It tried to fire up three times failed went to lock out
And BAM I am back to square one, Client has No Book and for some reason Baxi Techs have all gone home.
Have I missed something, I am a numpty nuggets (well I know I am but still need to sort the boiler out )
Any Clues would be welcome.
I went to a 100He (bahama megaflow or what ever they decide to badge it as today ) and the lock out light was lit
So i try to reset it Nowt
I check the OV thermister room temp 15k Which I presume is ok
Temp Thermister the same
I disconnect the earth on the condesate trap and nowt
So I change the Main PCB (after driving like a mad thing to the shop before the lazy wotsits take the rest of the day off!! gits) and Success I thought
It tried to fire up three times failed went to lock out
And BAM I am back to square one, Client has No Book and for some reason Baxi Techs have all gone home.
Have I missed something, I am a numpty nuggets (well I know I am but still need to sort the boiler out )
Any Clues would be welcome.