I have a 9" brick wall, just under 6' high, with piers at 4 metre intervals. I want to put a gate in it, 33" plus frame, say one metre brickwork removed.
If I put it half way between piers, there would be two 1.5 metre unsupported runs. But I would prefer to position it next to one of the piers, so the run would be 3 metres.
Is that too far? I doubt there is enough footing to build a pier where it was not originally planned.
If I put it half way between piers, there would be two 1.5 metre unsupported runs. But I would prefer to position it next to one of the piers, so the run would be 3 metres.
Is that too far? I doubt there is enough footing to build a pier where it was not originally planned.