I’m slowly working my way though my kitchen and am considering a future fridge/freezer with a water dispenser so would like to install pipework should we choose to have one.
What would normally be expected for connection? Would a 10mm JG speedfit with an angle and stop connected to the cold water feed be sufficient or is there something more specific required?
What would normally be expected for connection? Would a 10mm JG speedfit with an angle and stop connected to the cold water feed be sufficient or is there something more specific required?