Millions used across Europe might say differently. If it was a gimmick I think that would have been proved by now.

The export tariffs are still there but plug in solar can't be exported, unless you are already on an export tariff.Would our government do the same, i wonder?
The export tariffs are still there but plug in solar can't be exported, unless you are already on an export tariff.
I think batteries and export will come sooner rather than later, we can only wait for now.

Depends on usage really, if someone is home most of the day then you could power anything with it. If they are out all day then it will still power things while you are out, like fridge/freezers, but you'd really need to do your sums on potential savings.Is it worth the expense just to provide additional power to home appliances when a solar panel will provide better supply long term for the whole house?

It is not part of the installation if not permanent, i.e. hard wired.Strictly speaking, yes, only installation and permanent decommissioning needs notification. Not sure if 10 years is stretching that to breaking point, but those are the rules.
Are you sure of that, as the G98 for plug-in seems to be the same one used for installed systems, the requirement is that you have a smart meter so without a smart meter no export payment, but not seen anything to say plug in not paid for export.The export tariffs are still there but plug in solar can't be exported, unless you are already on an export tariff.
This is the problem, we in essence have four tariffs, to consider, the standard tariff of I think today around 26p/kWh 24/7. The export tariff of 12p/kWh at the moment, the off-peak tariff of around 8.625p/kWh and the peak tariff of around 32.277p/kWh and once we have solar and battery of a reasonable size, the move to an off-peak tariff pays.Is it worth the expense just to provide additional power to home appliances when a solar panel will provide better supply long term for the whole house?
The low extended roof over garage and living room is idea for mounting solar panels, low down for access, but high enough so cars in the drive do not shade it.
the wall between middle and upper floor may take panels, but the route to supply kitchen is hard, likely around side of house, no good route though the house, so to fit a battery pack to feed the house not so easy, and this is what needs to be considered with a non grid tie battery pack, can you use the energy it provides, in a way which means going to a split tariff will pay?
Not according to G98.It is not part of the installation if not permanent, i.e. hard wired.
You can't get an export tariff unless it's professionally installed, so you won't get paid. Unless you already have one with a certified solar installation.Are you sure of that, as the G98 for plug-in seems to be the same one used for installed systems, the requirement is that you have a smart meter so without a smart meter no export payment, but not seen anything to say plug in not paid for export

Just to clarify, it isn't part an electrical installation, rather the whole plug in solar kit is installed in a property.Not according to G98.

Do you trust them? Those numbers are useless without saying size of solar array, and batteries. September to dateThe UK’s Energy Savings Trust says that, without considering export payments, a London home with rooftop solar could make annual savings of £650 (€750) if inhabitants are home all day. This drops to £530 (€611) if they’re out until 6pm on most days.
until March
so for 4 months I use batteries to move power from off-peak to peak times, but best month this year
shows if I want to self use the power around 3 kW would be a better size. Maybe smaller, so 2 kW into a battery pack, and it is unlikely one would stop saving solar produced very often because battery was full.
Having read where an electrician installed his own solar panels and was not on the installers register, it seems they can't stop you getting export tariff just because not installed by an electrician who has done the course and got the bits of paper.You can't get an export tariff unless it's professionally installed

Yes, you don't have to be registered at all, but it is beyond the simple plug in DIY capabilities.Having read where an electrician installed his own solar panels and was not on the installers register, it seems they can't stop you getting export tariff just because not installed by an electrician who has done the course and got the bits of paper.
He did it seems to have a bit of a fight on his hands, and it was not accepted straight away. But he proved they do have to accept applications from non-registered people. Seem to remember it was on one of the hundreds of efixx videos.

Unlike in Germany, UK domestic plug sockets aren’t generally designed for back-fed generation,
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local