Hey guys.
Following another thread of mine regarding the removal of 2 walls, I've become a bit more confused with how I go about it.
I understand I need to get the BCO to see things before and after (or just after?) and they need to see the structural calcs, or/and drawings? But who is my first port of call?
I plan on doing the work myself, I am good hand on and believe this is something I can do, but obviously I need to be told what can and can't be just knocked down.
So do I need an engineer, architect or surveyer first? Or even BC?
Cheers
Following another thread of mine regarding the removal of 2 walls, I've become a bit more confused with how I go about it.
I understand I need to get the BCO to see things before and after (or just after?) and they need to see the structural calcs, or/and drawings? But who is my first port of call?
I plan on doing the work myself, I am good hand on and believe this is something I can do, but obviously I need to be told what can and can't be just knocked down.
So do I need an engineer, architect or surveyer first? Or even BC?
Cheers
