Battening out my roof slowly.... then tiling.... equally slowly. Got a feeling with the falling night time temps that I’ll be pointing my verges and setting my ridges when the temps are below the recommended 4 degrees at least at night.
What to do? Additive and cover up?
What to do? Additive and cover up?