Shower Enclosre RCD

Joined
23 May 2005
Messages
207
Reaction score
0
Location
Liverpool
Country
United Kingdom
This type of enclosure already has an MCB incorporated along side the RCD, what is the prefered method of connecting to the actual CU?

Or should you always go for henley blocks?
 
T+E if coming from an existing fuse board, as when adding an RCD to existing circuit. Meter tail if coming from a Henley block either direct from meter or via main isolator switch, and sharing a supply with CU. Note that the requirement for a single point of isolation is needs to be met then.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top