First of all, Im on a learning curve with this topic so any help/ guidance would be greatly appreciated. Thank you!
Long story short, boiler broken, PCB and gas valve replaced (was told that one might have short circuited the other). All working afterwards and engineer also did a service (certificate attached). However, he told us that “Gas supply to boiler under sized. 18mlb at meter & 9.5mlb at boiler on max rate”
The same engineer serviced and issued all-clear certificate last year so I’m shocked now that he said the pipework needs replacing and “happy to ring the office to give you a quote”.
I could be totally wrong but suspect:
1) a faulty gas valve was used
2) blockage in the pipework (it has always been fine since 2015, previous owner was a landlord and had to do certificate every year, until we bought in 2021 but something might have happened)
If 1 is likely, I’ll push for the engineer to come back and take a look. Fail that, I’ll get a second opinion from another company to get the 1st engineer to make his job right.
If 2 is likely, I’ll have to call the supplier to take a look?
Your advice on this would be appreciated. Many thanks in advance.
P/S: the gas rate (on high) in the attached certificate said 37 m3/h but I think he probably meant 3.7m3/h? If so, this appears to be within normal range, but how does that work given the pressure is low?
Long story short, boiler broken, PCB and gas valve replaced (was told that one might have short circuited the other). All working afterwards and engineer also did a service (certificate attached). However, he told us that “Gas supply to boiler under sized. 18mlb at meter & 9.5mlb at boiler on max rate”
The same engineer serviced and issued all-clear certificate last year so I’m shocked now that he said the pipework needs replacing and “happy to ring the office to give you a quote”.
I could be totally wrong but suspect:
1) a faulty gas valve was used
2) blockage in the pipework (it has always been fine since 2015, previous owner was a landlord and had to do certificate every year, until we bought in 2021 but something might have happened)
If 1 is likely, I’ll push for the engineer to come back and take a look. Fail that, I’ll get a second opinion from another company to get the 1st engineer to make his job right.
If 2 is likely, I’ll have to call the supplier to take a look?
Your advice on this would be appreciated. Many thanks in advance.
P/S: the gas rate (on high) in the attached certificate said 37 m3/h but I think he probably meant 3.7m3/h? If so, this appears to be within normal range, but how does that work given the pressure is low?
Attachments
Last edited:
