Structural loading calcs for the steel beam require the beam be unholed. Even with a large safety factor (e.g. failure at 10x loading or whatever) it's not worth risking it.
Structural loading calcs for the steel beam require the beam be unholed. Even with a large safety factor (e.g. failure at 10x loading or whatever) it's not worth risking it.
I plan to add a subframe for the whole floor so the steel beams won't be visible. Yes I know that the pink fireboard will effectively be a waste of time but hey if it gives me extra time to get out why not.
It's not the fire test but the reduction in structural strength that will happen if I drill 4mm holes through the steel beam. Having more vertical drop down wood from ceiling (itself screwed into joist above) is far safer than drilling holes in steel beams and attaching the timber subframe into.
Well the advice I got was to 1) drill into steel beams (no I don't want a 50kg steel beam buckling and falling down), 2) redo plasterboard (fair enough I will do), 3) add rigidity to the frame (which I will do by adding vertical drop downs). So no I know I didn't do a good job - but half the advice I got didn't register the steel beams.
Well the advice I got was to 1) drill into steel beams (no I don't want a 50kg steel beam buckling and falling down), 2) redo plasterboard (fair enough I will do), 3) add rigidity to the frame (which I will do by adding vertical drop downs). So no I know I didn't do a good job - but half the advice I got didn't register the steel beams.
The OP needs to notify the government that it's been weakened so is about to collapse. It seems to have survived the last 135 years fairly well though.
Ok if I were to redo I may aswell lower the ceiling even further to below the steel beams (parallel but underneath) overall ceiling height 2.3m. Basically span a 3x2" from load bearing wall to load bearing wall. So this way could I just use 2 x timber to masonry joist hangers ( one either end) with no need to fix the timber to the steel beam (which is above)? Would this work?
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local