Testing & Certificates

Joined
13 Jul 2006
Messages
13
Reaction score
0
Location
Powys
Country
United Kingdom
Am unsure to the following: the very nice plumber chap who gives me loads of jobs quite often calls and says that there is another boiler that needs bonding and by-the-way the stat needs moving or changing to something more modern sort of thing, none of which is ever a problem technically. So the question is... is this a case for the minor installation certificate or can the whole thing just be done, check the Zs on the boiler circuit, the house main bonds and walk away...???
 
You should test and issue a certificate for every job you do.

Whether it needs notifying or not is another matter.
 
ok so what happens if the entire boiler system, stats, immersion cut-out and zone valves are all powered via a 3A 3-pin plug (rather than a fixed fused spur)? Does the same rule still apply?
 
and... I seem only to have certificates (both minor works and electrical installation) all which require notification...
 
owspark said:
ok so what happens if the entire boiler system, stats, immersion cut-out and zone valves are all powered via a 3A 3-pin plug (rather than a fixed fused spur)? Does the same rule still apply?

All of the above would be classed as fixed wiring and should not be fed via a plug and socket.
 
Sorry, what I should have written is:

You should test and issue a certificate for every job you do, which involves modification or alteration of the fixed wiring.

As for notifying, it is the job itself which dictates wether the job is notifiable, not the type of certificate issued.

If for example you wired an additional socket in someones bedroom, you should test and issue a MEW certificate. However if you wired an additional socket in someones kitchen, you should test, issue a MEW certificate AND notify LABC.
 
owspark said:
Am unsure to the following: the very nice plumber chap who gives me loads of jobs quite often calls and says that there is another boiler that needs bonding and by-the-way the stat needs moving or changing to something more modern sort of thing, none of which is ever a problem technically. So the question is... is this a case for the minor installation certificate or can the whole thing just be done, check the Zs on the boiler circuit, the house main bonds and walk away...???

Just out of interest, how do you bond the boiler?
 
Yes seems a bit dull doesnt it. just to strap all the 5 or 6 pipes together with 10mm where less than a foot away they are linked via the boiler housing anyway.
 
RF Lighting said:
Sorry, what I should have written is:

You should test and issue a certificate for every job you do, which involves modification or alteration of the fixed wiring.

As for notifying, it is the job itself which dictates wether the job is notifiable, not the type of certificate issued.

If for example you wired an additional socket in someones bedroom, you should test and issue a MEW certificate. However if you wired an additional socket in someones kitchen, you should test, issue a MEW certificate AND notify LABC.

If you issue a MEW for a domestic installation, which type do you issue, the domestic MEW or a general MEW?
 
owspark said:
Yes seems a bit dull doesnt it. just to strap all the 5 or 6 pipes together with 10mm where less than a foot away they are linked via the boiler housing anyway.

And which regulation(s) are you working to?
 
Pensdown said:
If you issue a MEW for a domestic installation, which type do you issue, the domestic MEW or a general MEW?

AFAIK Either is acceptable.

Personally we use the standard MEW certificates, but we have now started to use the domestic EIC and PIR certificates.
 
Pensdown said:
owspark said:
Yes seems a bit dull doesnt it. just to strap all the 5 or 6 pipes together with 10mm where less than a foot away they are linked via the boiler housing anyway.

And which regulation(s) are you working to?

Not sure. Will you enlighted me as to which I should be aiming at... I think perhaps it is one of these historical things where all boilers seem to have bonding nearby and when the plumber decided to rip out all the pipework when installing new the he seems to think it requires same bonding to be replaced. I am more than willing to learn...
 
owspark said:
just to strap all the 5 or 6 pipes together with 10mm where less than a foot away they are linked via the boiler housing anyway.

Unless the boiler had been removed for whatever reason.
 
RF Lighting said:
Pensdown said:
If you issue a MEW for a domestic installation, which type do you issue, the domestic MEW or a general MEW?

AFAIK Either is acceptable.

Personally we use the standard MEW certificates, but we have now started to use the domestic EIC and PIR certificates.

We've been using normal MEW and normal PIR so I'm glad to hear we are not alone. This week we have taken delivery of a domestic set of test certs (yippee, another £ 100+ well spent) but I've not had a chance to compare them to see if we've wasted our money or not.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top